ジオテック Official site

Shin-ka Correction Method | Tilt Elimination and Underground Support

The tilt of the building and differential settlement will be safely restored through specialized repair work.

In the "Settlement Correction Work," we explain the process from uneven ground settlement (differential settlement) to repair. The mainstream "steel pipe pile driving method" is a technique that stabilizes the entire structure by utilizing the building's load as a reaction force with a jack to push the steel pipe piles down to the supporting ground. [Contents] ■ Building level measurement for current condition assessment ■ Flow from differential settlement occurrence to correction ■ Details of the steel pipe pile driving method ■ Overview of each method *For more details, please check the PDF materials or feel free to contact us.

Related Link - http://www.jiban.co.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Method of repair work: "Settlement correction work"

PRODUCT

Distributors