ジオテック Official site

Settlement correction work | Restoration of tilted houses | Geotech

Effective for building tilt! Let's restore a stable living environment with subsidence correction work.

At Geotech, we explain the process of "settlement correction work" to eliminate the tilt of buildings caused by different ground subsidence. In the mainstream steel pipe pile driving method, steel pipe piles are driven into the supporting ground using jacks, directly transferring the building's load to the ground, thereby stabilizing and restoring the entire structure. [Contents] ■ Building level measurement (current situation assessment) ■ Flow from the occurrence of differential settlement to correction work ■ Steel pipe pile driving method ■ Overview of each method *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.jiban.co.jp/service/chinka/index.htm

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Method of repair work: "Settlement correction work"

PRODUCT

Shallow correction work | A safe jack-up plan to correct the tilt of the building without the need for moving or temporary housing, allowing you to stay in your current residence | Geotech

TECHNICAL

Distributors