Proposal for different subsidence countermeasures and repair works.
When signs of differential settlement are confirmed, a specialized team will responsibly provide support.
The selection of methods and the determination of feasibility for settlement correction are carried out carefully based on on-site investigations. Specifically, we examine site conditions such as the degree of inclination, the damage state of structures, foundations, and external works, ground data, and buried objects. Additionally, it is important to consider whether the settlement is ongoing or has stabilized, as well as whether the response will involve a comprehensive correction of the entire foundation to prevent further settlement or if it will be limited to partial corrections.
basic information
The tilt of a building varies significantly depending on each specific building. To choose the best solution, it is necessary to consider the investigation items based on the building's structure, the degree of tilt, and the ground conditions.
Price range
Delivery Time
Model number/Brand name
Consulting for Settlement Correction Works
Applications/Examples of results
Option survey (additional costs will be incurred.) Floor level of buildings above the second floor By measuring the floor level of buildings above the second floor, we can gain a more detailed understanding of the building's tilt. Visual inspection under the floor We visually observe cracks in the foundation from underneath the floor to investigate the building's tilt in more detail. Ground survey using SWS test (screw weight penetration test) We investigate the distribution of weak ground or fill that may cause the building to tilt.