Pure Pile Method | Geotech [Performance Certification] Ground Reinforcement
A pile reinforcement technology for single-family homes that eliminates the risks of existing ground and ensures stable bearing capacity.
As a solution to fundamentally eliminate the risk of insufficient bearing capacity and settlement due to ground improvement, we will adopt the Pure Pile Method (PP Method). By using a rod with a conical excavation head to laterally compact and excavate the ground, and by injecting cement milk for replacement, we will form high-strength pile-like columns.
basic information
Since cement milk is not mixed with the ground, the quality of the pile-like columns is not affected at all by the soil conditions. Therefore, they consistently demonstrate high strength and high quality regardless of the ground type. The construction method does not loosen the ground, resulting in a high vertical bearing capacity. It can also be applied to humus-rich soils. By using spiral rods, the excavation performance in sandy soils is improved. Straight rods do not have a soil discharge mechanism, resulting in minimal residual soil generation. The designed pile diameter is only 20 cm, which is relatively small, allowing for the distribution and support of building loads with a large number of pile-like columns, ensuring safety and reliability. Compared to conventional column improvement methods, it can be constructed at a lower cost.
Price range
Delivery Time
Model number/Brand name
Pure pile method
Applications/Examples of results
Applicable Types of Ground Base Ground at the Tip of the Column: Sandy Ground, Clayey Ground Surrounding Ground of the Column: Sandy Ground, Clayey Ground, Humus Soil (however, the friction of humus soil is not considered) Maximum Construction Depth When the base ground at the tip of the column is sandy ground: 10m from the construction ground surface When the base ground at the tip of the column is clayey ground: 10m from the construction ground surface Applicable Buildings Small-scale buildings that satisfy all of the following conditions 1 to 4, as well as ground slabs: 1. 3 stories or less above ground 2. Height of 13m or less 3. Eaves height of 9m or less 4. Total floor area of 1500m² or less