Geotech | Surface Improvement Method for Shallow Soft Ground
Ideal for shallow soft layers. A surface improvement method that suppresses liquefaction and settlement through plate-shaped ground improvement.
This is a surface improvement method that simultaneously achieves support reinforcement from the ground up and prevents differential settlement and liquefaction in weak ground distributed at shallow depths. In this method provided by Geotech Co., Ltd., cement-based solidifying materials are uniformly mixed and stirred with the soil of the original ground using heavy machinery, creating a strong slab-like improved body through thorough compaction. This technique not only enhances the stability of structures but also ensures low noise and low vibration during construction, completing the work in a short period and minimizing the impact on the surrounding environment. Based on a clear procedure, this engineering approach guarantees reliable ground bearing capacity reinforcement from the design and supervision stages.
basic information
This is a strict construction management specification that ensures reliable quality and precision. The construction steps adhere to a clear process that includes stripping the topsoil, applying the solidifying agent, mixing and stirring, confirming the improvement thickness, temporary compaction, leveling the surface, and finishing compaction and level confirmation in both vertical and horizontal directions using a vibrating roller. As part of quality inspection, we conduct verification of reliable strength manifestation through uniaxial compression tests on collected mold cores. Furthermore, we cover items that scientifically confirm the mixing state of soil and solidifying agents by utilizing the property that turns purple through a phenolphthalein reaction. We will submit improvement plans, cross-sectional drawings, and indoor mixing test results as deliverables.
Price range
Delivery Time
Model number/Brand name
Surface improvement method
Applications/Examples of results
It is suitable for various site conditions where there are soft soil layers in the surface layer. Specifically, it is effective for land where the topsoil has been turned over due to farming, or sites that have become rough near the surface soil due to building demolition. Additionally, there are examples of applications for cases where buildings overlap with backfill areas due to tree cutting, root removal, or the removal of buried objects, as well as projects that want to start early right after earthworks. In practice, we use backhoes and 1-ton vibrating rollers, and we thoroughly predict hazards through KY meetings before construction to prevent accidents. During the withdrawal, we clean the adjacent roads to avoid leaving mud stains, thus balancing high consideration for neighbors with reliable construction accuracy.