Geotech | Housing Tilt and Settlement Correction Work

Specialized in preventing further sinking. We safely level tilted houses with a reliable support method.

Geotech challenges the correction of buildings with differential settlement through advanced engineering techniques. In our flagship "steel pipe pile driving method," we use the weight of the building as a reaction force to drive steel pipe piles into the supporting ground using hydraulic jacks. This ensures not only horizontal correction of the tilt but also high permanence to prevent future settlement. Furthermore, based on engineering analysis of the ground and settlement conditions, we propose and implement optimal solutions tailored to the situation, such as "pressure slab method," "building relocation and new foundation pile construction," and "cement milk injection method."

Related Link - https://www.jiban.co.jp/service/chinka/index.htm

basic information

Prior to construction, a detailed preliminary survey consisting of level measurements of the building's outer perimeter and indoor floors, an investigation of the underfloor, and 4 to 5 points of Swedish sounding tests will be conducted in one day, and a survey report, ground investigation report, and survey drawings will be submitted as deliverables. The steel pipe pile driving method can be executed while maintaining the residential state (no need to move out), and it generates extremely low noise, vibration, and dust, with the equipment storage area kept to a small space. The process will be carried out under a consistent management standard, from preparation, demolition, and excavation of the work space, to the driving and welding of steel pipes using reaction forces, leveling adjustments with pile head jacks, filling mortar into the foundation base and head (root wrapping), and restoration of the subbase for floor concrete, among other tasks.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is widely applied for the recovery of structural integrity or maintenance of the current condition when differential settlement occurs in structures. In practice, after measuring differential settlement, a monitoring period of six months is generally conducted, and the optimal construction method is selected based on the data trends. As examples of achievements, in cases where the soft layer is deep, methods such as steel pipe pile driving or moving the building and installing new piles are used, while in cases where the soft layer is shallow or after settlement has stabilized, a pressure plate method using a pressure plate (steel plate) placed under the foundation is applied. Additionally, when the goal is to maintain the current condition after settlement has stabilized, methods such as cement milk injection are adopted, demonstrating a variety of applications based on the deformation patterns of the structure and ground conditions.

Method of repair work: "Settlement correction work"

PRODUCT

Shallow correction work | A safe jack-up plan to correct the tilt of the building without the need for moving or temporary housing, allowing you to stay in your current residence | Geotech