ジオテック Official site

For Operating Factories | Soil Contamination Survey (Designated Survey Agency)

Early response based on the premise of continued operations. Ensure effective management of contamination risks without stopping sales.

The Ministry of the Environment's "designated investigation agency" will conduct soil contamination surveys and historical investigations (Phase 1) at operating factories using the latest technical specifications. In anticipation of land transfer and asset evaluation, accurate historical investigations (Phase 1) and soil condition surveys based on the Soil Contamination Countermeasures Act are essential. Geotech will conduct retrospective analyses of past land use and the actual conditions of specific facilities, and will develop a sampling plan compliant with Ministry of the Environment regulations based on site area and design excavation depth. We will provide consistent support from soil gas surveys and sample collection on-site to precise determination of hazardous substances (Phase 2), swiftly issuing an "environmental investigation report in the name of the designated investigation agency" to support the calculation of remediation costs and ensure safe land transfer while minimizing impacts on operations.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

Our soil contamination investigation is conducted as a "designated investigation agency" based on the Soil Contamination Countermeasures Act, using highly reliable and certain technical specifications. First, we conduct a "historical investigation (Phase 1)" to thoroughly analyze past land use conditions using information such as residential maps and registration records, and evaluate the potential for contamination. Based on these results, we transition to a "soil overview investigation (Phase 2)" where we sample and analyze the actual soil on-site to scientifically confirm the presence or absence of contamination. In particular, when the excavation area of a building is long in the direction of extension, we take five samples as one sample for planar consideration. In cases where the excavation depth exceeds 5 meters, we adopt specifications to increase the number of samples by dividing them in the depth direction to prevent overlooking contaminated soil, and we also use prior sample collection through boring. This approach thoroughly eliminates the risks associated with simple investigations that only consider the near-surface area and guarantees high-precision data that fully meets disposal and administrative standards.

Price range

Delivery Time

Model number/Brand name

Early investigation of factories in operation.

Applications/Examples of results

* Conducting a "historical investigation (Phase 1)" and soil contamination risk assessment prior to the reconstruction, closure, or land transactions of factories and business sites. * Implementing reliable soil sampling (both horizontal and vertical) and hazardous substance analysis on-site in full compliance with legal obligations (such as Articles 3 and 4 of the Soil Contamination Countermeasures Act) and local environmental regulations. * Conducting environmental hazardous substance assessment tests on construction-generated soil (excavated soil) associated with land development and alterations, and preparing environmental investigation reports under the name of designated investigation agencies.

Initiatives at an Operating Factory

TECHNICAL

Designated Investigation Agency | Soil Contamination Survey | How to Promote Cost Optimization Comprehensive Investigation through Gradual Sampling to Protect Corporate Social Credibility | Geotech

TECHNICAL

Distributors