ジオテック Official site

Soil contamination risks and residual soil measures during factory reconstruction

Soil contamination risks and residual soil measures during factory reconstruction.

This is a soil contamination countermeasure and residual soil disposal solution provided by an Environment Ministry-designated investigation agency, specializing in the closure or rebuilding of chemical and plating factories, as well as risk management during operations. We conduct precise analysis of specific hazardous substances using official methods and quickly provide official evidence that meets legal requirements. Our advanced technology allows for soil sampling from beneath floors and in narrow pits without halting operations, visualizing the risk of underground leaks. This prevents significant remediation costs and construction interruptions that may arise during future sales or rebuilding, protecting asset value and social credibility. It is an essential package that supports everything from voluntary investigations to mandatory surveys and compliance assessments for generated soil. We achieve thorough reduction of business risks and maximize cost performance, ensuring the safety of construction projects in a solid manner.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

This is a specification for soil contamination and residual soil analysis measurements that comply with standard methods tailored to the characteristics of factories handling specific harmful substances. It addresses the analysis of the leaching amounts and concentrations of volatile organic compounds such as trichloroethylene and tetrachloroethylene, as well as heavy metals and hazardous items like hexavalent chromium, lead, arsenic, and total cyanide. We employ an electric simple boring method (SCSC method) that allows for the sampling of deep soil cores up to 5 meters deep from small spaces indoors or under eaves of operating factories, without disturbing the building structure, through holes just a few dozen millimeters in diameter. Throughout all processes, we ensure reliable evidence without data tampering and deliver high-quality results promptly to our customers.

Price information

 

Price range

P3

Delivery Time

P4

Model number/Brand name

Soil survey

Applications/Examples of results

This system is utilized for the preliminary inspection of excavated soil resulting from the establishment of new production lines and the reconstruction of buildings within the factory premises, as well as for the mandatory surveys based on Article 3 of the Soil Contamination Countermeasures Act due to the abolition of facilities that use hazardous substances and factory closures. It is also used for voluntary risk assessments as part of ongoing environmental management. Factory managers, general affairs and environmental management personnel, and management are widely adopting this system to obtain reliable environmental evidence without halting factory operations, ensuring accurate estimates for future land sales and restoration costs. It is an essential system for eliminating barriers to construction progress in advance and achieving a high level of cost reduction while fully complying with regulations.

Soil contamination risks and residual soil measures during factory reconstruction [Designated Investigation Agency: Geotech]

TECHNICAL

Soil Contamination Survey and Historical Investigation Brochure for Real Estate Companies

PRODUCT

Distributors