Designated Investigation Agency | Support for Rapid Execution of Soil Analysis and Clearing Acceptance Standards
Elimination of bottlenecks in soil disposal. Ensuring compliance with acceptance standards through rapid soil analysis.
In a situation where delays in excavation and underground development cannot be tolerated due to tight construction schedules, we will implement soil analysis and residual soil acceptance standards with speed as the top priority while ensuring quality as a designated investigation agency by the Ministry of the Environment. We will conduct precise sampling and analysis in accordance with official methods in an extremely short time and promptly submit official documentation required by authorities and disposal sites. By combining this with prior historical investigations, we will eliminate rework and complete the management of soil contamination risks in the shortest possible time. This will fundamentally remove schedule-related hindrances such as construction delays due to waiting for analysis, confusion in vehicle dispatching, and unexpected cost increases due to acceptance refusals. With Geotech's advanced mobility and immediate delivery system, we will achieve both cost optimization and strict adherence to deadlines, thereby reducing business risks and improving cost performance. We provide a reliable foundation for ensuring safety in construction projects.
basic information
This is a speed analysis specification compliant with official methods, boasting industry-leading lead times to completely prevent project delays. It supports testing for the leaching and content of all specified hazardous substances, including Class 1 volatile organic compounds, Class 2 heavy metals, and Class 3 pesticides. We promptly deploy our own high-efficiency self-propelled boring machines and simple boring equipment to the site, quickly sampling soil cores at the specified depth through dry excavation and storing them in sealed containers. By optimizing the laboratory processes from extraction to measurement and the issuance of weighing certificates, we guarantee high-speed data output without sacrificing reliability. Throughout all processes, we ensure reliable evidence without data tampering and swiftly deliver high-quality results to our customers.
Price information
-
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil survey
Applications/Examples of results
This system is utilized for underground excavation in urban buildings, construction sites where sudden changes in soil acceptance standards have been requested, and for pre-compatibility assessments of excavated soil in redevelopment areas with tight deadlines. It is widely adopted in various ultra-rapid soil management scenarios for construction companies, site managers, and procurement personnel who need to complete analyses non-stop alongside excavation to fully utilize dump trucks, especially when they are urgently required to submit official evidence from disposal sites or municipalities, or when there is no long-term temporary storage space for soil. This system is essential for eliminating barriers to construction progress in advance and achieving a high level of cost reduction while fully complying with regulations.
catalog(3)
Download All Catalogs