Designated Investigation Agency | Procedures to Eliminate the Risk of Delays in Construction Schedule Due to Soil Confirmation
Elimination of construction interruption risks. One-stop support from pre-specification confirmation to official analysis.
In land transactions and construction sites, it is urgent to avoid asset depreciation due to soil contamination and rejection of surplus soil acceptance. Our company, as a designated investigation agency based on the Soil Contamination Countermeasures Act, handles everything from boring in narrow sites to official analysis of large-scale surplus soil. To prevent construction delays, we standardize pre-specification checks and implement "full-layer sampling according to excavation depth" to meet the Chiba Prefecture surplus soil regulations. We address the practical issue of data being unusable for each disposal site with a plan directly connected to the site. We also thoroughly identify additional analyses for oil content, dioxins, heavy metals, and issue measurement certificates. We support the registration practices for public works in Tokyo and compliance with various regulations, achieving efficient soil and surplus soil management that does not halt construction.
basic information
This is a residual soil specification compliance inspection system conducted by a designated investigation agency, in accordance with the Soil Contamination Countermeasures Act and national construction-generated soil management standards. It utilizes a crawler-mounted hydraulic hammer drilling machine capable of dry excavation and a dual-tube sampler with a rotary sleeve, enabling precise full-layer sampling tailored to the maximum depth of root excavation. Analytical measurements are conducted using official methods compliant with the Ministry of the Environment's notifications (leaching tests and content tests), and it also accommodates additional measurements for items such as oil content, dioxins, heavy metals, and pH. The issued measurement certificates can be directly used for registration practices with local governments and disposal sites, facilitating the fastest possible acceptance approval and transportation permits under non-transferable rules.
Price information
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil survey
Applications/Examples of results
Urban redevelopment, the utilization of former factory sites, and infrastructure civil engineering works such as roads and railways utilize suitability certification to properly transport and accept excavated soil (excess soil) to disposal sites and recycling plants. This not only clears regulatory requirements but also serves as a pre-specification check to eliminate the risk of construction interruptions on site, allows for vertical layer sampling according to the excavation depth, and is optimal for simultaneously implementing additional measures for unique items such as oil content and dioxins specific to disposal sites. In the registration practices of public works in the city where the reuse of existing data is not permitted, it provides solid official analytical data specific to the site quickly, supporting a dump truck operation plan without delays.