Designated Investigation Agency | Comprehensive Layer Survey by Excavation Depth in Response to Chiba Soil Ordinance
Completely conquer the Chiba soil residue ordinance. Achieve zero acceptance refusals through full-layer sampling according to excavation depth, and do not stop construction.
This is a high-level environmental analysis service provided by a designated investigation agency that balances the proper disposal of construction-generated soil and the avoidance of soil risks. We completely eliminate risks such as work stoppages and acceptance refusals due to sampling deficiencies or insufficient analysis items through thorough pre-specification checks. For full-layer sampling according to the excavation depth required by regulations, we utilize an anhydrous drilling technology to accurately reflect the soil composition at each depth during sample collection. We have established a scheme that comprehensively addresses additional items such as oil content and dioxins, which are unique regulations of private disposal sites, starting from the sampling stage. Even in environments where strict reviews are required for public works in the city and municipal registration practices, we clear the constraints of not being able to reuse existing data and quickly provide official data specific to the lot in question. This enables efficient disposal of surplus soil without halting construction.
basic information
This is a specification for high-precision soil analysis and precise sampling to fully comply with the construction soil regulations (residual soil regulations) of each municipality and the acceptance specifications for public works. The method employs anhydrous rotary double-tube drilling to prevent chemical changes and thermal alteration of the core during drilling and sampling, ensuring perfect uniform sampling of all layers according to the maximum excavation depth. The analysis items include standard hazardous heavy metals and volatile organic compounds, as well as oil content, dioxins, COD, and total nitrogen specified individually by private disposal sites. The specification covers everything from the issuance of measurement certificates to the preparation of application documents with site photos and plot diagrams necessary for registration practices that prohibit the reuse of data from other sites.
Price information
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil survey
Applications/Examples of results
It will be introduced to build official evidence to clear the acceptance review for the disposal of construction-generated soil (excavation residual soil) in major projects, public works, and private development activities in the metropolitan area in one go. Before construction begins, procedures will be implemented to confirm the residual soil regulations of the municipality where the soil will be transported, as well as the specifications for sampling methods and analysis items defined by the disposal site, to prevent mismatches on site. It will be used for planned construction management that does not halt work and for reducing residual soil costs, including preventing contamination bypass in the depth direction through full-layer sampling according to excavation depth, expediting the registration practices that are deemed non-transferable for each site, and clearing additional analysis items such as oil content and dioxins.