ジオテック Official site

Site history investigation for land use change of former factory site | Completely eliminate regulatory risks

Thoroughly eliminate regulatory risks from changes in characteristics at temporarily exempted sites and investigation orders! Verify the land history for changes in use to detect risks of converting former factory sites into residential land.

When redeveloping and changing the use of land that has received a temporary exemption from the investigation obligation under Article 3, Paragraph 1 of the Soil Contamination Countermeasures Act at factory sites after the abolition of specific facilities for harmful substances, strict compliance with legal risks is essential. In particular, if the land being changed has an area of 900 square meters or more, prior notification is mandatory, and the governor will issue an investigation order requiring effective measures. This catalog details the practicalities of "historical land use verification" to fully control such regulatory risks and prevent compliance violations and unexpected business disruptions. It covers advanced historical investigation methods by Geotech that multilaterally trace the handling history of harmful substances and changes in equipment layout from the analysis of official notification documents, as well as the process of official sampling surveys that fully comply with administrative orders. Use this book to eliminate legal risks, smoothly complete sound and clean residential development, and protect the social credibility of your company.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

This is a soil self-investigation service specialized in legal compliance and conformity provided by Geotech, a designated investigation agency, fully compliant with the Soil Contamination Countermeasures Act and the Ministry of the Environment guidelines. In the Phase 1 historical investigation related to changes in land use such as temporary exemption areas, we meticulously examine public notification documents, past drawings, and aerial photographs to accurately trace the placement of facilities that use harmful substances and the history of 26 specific harmful substances. We prepare a rational and scientific risk assessment report that is neither excessive nor insufficient in response to investigation orders under Article 3, Paragraph 8 of the law. Additionally, in-field investigations based on orders are conducted swiftly with strict sampling and component analysis as stipulated by the law.

Price information

-

Price range

P3

Delivery Time

P4

Model number/Brand name

Geological and historical survey

Applications/Examples of results

It will be used for prior risk management when changing the use of factory sites or business lands that are temporarily exempt from the investigation obligation under Article 3, Paragraph 1 of the law, to residential areas such as housing or condominiums, and when making changes to the land characteristics of 900 square meters or more, or for sale and redevelopment. The main objectives are to facilitate the notification of changes based on Article 3, Paragraph 7, to respond accurately to legal investigation orders issued by the governor (Paragraph 8), and to establish a solid safety certification for residents to be submitted to the administration. It is ideal for situations where compliance with legal regulations is fully cleared, completely avoiding compliance violations and sudden work stoppages, and safely promoting business plans.

Designated Investigation Agency | Soil Contamination Survey | Confirming Historical Land Use for Factory Site Redevelopment to Comply with Regulations and Prepare for Mandatory Investigations | Geotech

TECHNICAL

Soil contamination survey

PRODUCT

Designated Investigation Agency | Soil Contamination Survey | How to Promote Cost Optimization Comprehensive Investigation through Gradual Sampling to Protect Corporate Social Credibility | Geotech

TECHNICAL

Distributors