Designated Investigation Agency | Safe and Rapid Removal Methods for Excavated Soil from Condominiums
Thoroughly manage the excavation soil contamination risks in each section of the apartment complex to prevent delays in construction. A method for safe and prompt removal through optimal planning and expedited public analysis.
In large-scale civil engineering works associated with condominium development, efficiently transporting the massive amount of excavated soil generated from a vast area off-site is key to maintaining the construction schedule. This document explains a practical approach to smoothly proceed with the removal while appropriately handling soil contamination risks. Specifically, it details the process of formulating a "soil removal plan" through "sectional management" to prevent contamination mixing and optimizing vehicle dispatch and routes. Furthermore, it covers the utilization of "short-term public analysis," which is essential for meeting acceptance criteria, and the strengths and support system of Geotech, a designated investigation agency by the Ministry of the Environment. This guidebook is indispensable for practical personnel from developers and general contractors to strictly adhere to laws and local soil disposal regulations, eliminating unexpected costs and stagnation risks.
basic information
The technical specifications of this method comply with the Soil Contamination Countermeasures Act designated by the Ministry of the Environment and the standards of construction-generated soil (excavated soil) regulations of each municipality. In the sampling operations, the site is divided into multiple work zones (grid management), and a sampling plan is developed for each target area. The analysis items include tests for the leaching and content of specific hazardous substances (first-class volatile organic compounds, second-class heavy metals, third-class pesticides, etc.), as well as various chemical analyses that meet the acceptance criteria for each type of excavated soil. A short-term official analysis system based on official methods has been established, which reduces the lead time for reporting results compared to standard lab analyses and has the capability to issue reliable analytical measurement certificates.
Price information
-
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil survey
Applications/Examples of results
The main use is for site excavation and large-scale soil removal associated with new construction projects for condominiums, large commercial facilities, and buildings. It is optimally utilized in sites where the land area is extensive and there is a potential risk of soil contamination in specific areas or depths based on past land use history. It addresses situations where there is a need to prevent the mixing of contaminated soil by implementing area-specific management, as well as cases that require compliance certification to meet the strict acceptance standards set by various soil disposal sites. Additionally, it is used for operational sites of soil removal plans that finely adjust vehicle dispatch according to weather and progress, and for managing construction processes that aim to completely avoid delays due to waiting times for lab analysis, ensuring safe and rapid soil movement within a limited construction period.
catalog(3)
Download All Catalogs