ジオテック Official site

Rapid removal of excavated soil from a small apartment|Survey agency

A construction method for safely and quickly transporting earth and sand through area-specific management and short-term analysis under strict constraints.

In urban redevelopment areas, the construction of condominiums faces the ongoing spatial constraint of not being able to establish temporary storage sites for excavated soil within limited premises. This document systematizes practical know-how to address the unique challenges of such narrow work zones and to continue safe and rapid off-site transportation. It specifically presents the operational realities of high-density "zone-specific management" that optimizes heavy machinery movement, as well as the flexible construction methods for "soil transportation plans" that meticulously control dispatching along a timeline. Furthermore, it details the utilization techniques of "short delivery time public analysis" aimed at maximizing work efficiency through significantly reduced lead times, and the compact sampling technology of geotech that maintains accuracy even in complex site environments. This specialized document enhances on-site responsiveness to avoid compromising construction efficiency due to site area constraints.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

The urban-type specification of this method features a compact design that strongly supports construction in confined sites with limited land area. As a sampling specification, it applies portable or simplified mechanical sampling techniques that can operate in narrow work areas where large boring machines cannot enter. In the specifications for area-specific management and soil transport planning, just-in-time dispatch management with time differences based on the maximum load capacity of the temporary storage yard is implemented. The short-term official analysis specifications provide judgment data to the site at super speed, below the retention limit time for soil, overcoming site constraints with technical capabilities.

Price information

-

Price range

P3

Delivery Time

P4

Model number/Brand name

Soil survey

Applications/Examples of results

The main purpose is the off-site transportation of excavated soil associated with condominium development and building reconstruction projects conducted on "narrow sites" such as city centers and in front of train stations. There is a critically insufficient space on-site for temporarily storing soil, and it is optimally utilized under harsh conditions where the operation routes of heavy machinery are restricted. It is used for high-density management of work areas to effectively utilize the limited yard and for flexible soil transportation plans that involve precise scheduling adjustments on an hourly basis. It is implemented in conjunction with rapid delivery of judgment data that falls below the temporary storage limit for soil, with the aim of maximizing the potential of narrow sites.

Designated Investigation Agency | Soil Contamination Survey | Method for Rapid Removal of Excavated Soil in Small-scale Condominium Development with Area-specific Management and Flexible Planning | Geotech

TECHNICAL

Soil contamination survey

PRODUCT

Designated Investigation Agency | Soil Contamination Survey | Accurately grasping environmental risks of land from the operational phase to protect corporate social credibility and governance through voluntary historical investigations | Geotech

TECHNICAL

Distributors