ジオテック Official site

Foundation settlement remedied by steel pipe pile driving! Retaining wall and uneven ground repair work.

Eliminate the settlement of retaining wall backfill and cut-and-fill boundary strip foundations. An innovative technology that achieves high durability by pressing steel pipe piles into a hard layer using the building's own weight.

In uneven ground where backfill and cut-and-fill soil mix behind retaining walls, differential settlement of shallow foundations due to consolidation settlement and lateral flow occurs frequently. This differential settlement can cause cracks in the foundation and ground fissures, threatening the structural safety of the building. Our settlement correction work utilizes the weight of the building as jack reaction force to directly drive steel pipe piles into stable supporting ground. After precisely leveling the foundation on the settlement side with hydraulic jacks, we inject high-resin repair materials into the cracks and fill underground voids with lightweight self-hardening air milk. Construction can be carried out while residents are living in the building, reducing noise and vibration, and completing reinforcement safely and securely without the need for temporary housing. We will propose the optimal construction plan tailored to your needs.

Related Link - http://www.jiban.co.jp/service/etc/ganko.htm

basic information

This construction method uses small-diameter high-strength steel pipes (outer diameter 114.3 mm to 165.2 mm, wall thickness of 4.5 mm or more) that conform to the JIS G3444 STK400 standard as standard materials. The foundation of the building is excavated, and a steel pipe pile of approximately 1.0 m is driven into the supporting ground by extending it with the thrust of a hydraulic jack. The determination of the supporting layer is based on N-value data from tests such as the SWS test, ensuring that it is anchored into deep ground with reliable bearing capacity. For foundation repair, epoxy resin mortar and U-cut seal methods are employed, and bubble mortar (air milk) is used for ground filling. The total weight of the building and the allowable vertical bearing capacity of each pile are precisely calculated and fixed.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is used for the restoration of differential settlement in wooden houses adjacent to retaining walls and located at the boundary of valleys or cut and fill areas. It is effective in restoring foundation cracks and settlement caused by insufficient soil compaction or uneven ground. It is ideal for ground reinforcement in narrow sites where large machinery cannot enter, as well as for settlement correction work that can be carried out while the homeowner continues to live in the property without moving. Additionally, it is widely implemented for reinforcement in complex ground conditions adjacent to underground garages, measures against ground movement associated with surrounding environmental construction, and reinforcement work to prevent future settlement recurrence.

Settlement correction work | Fundamental correction of settlement in the wall-adjacent areas and uneven ground using the steel pipe pile driving method! Simultaneous high-density filling reinforcement of the subfloor ground voids | Geotech

TECHNICAL

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

Method of repair work: "Settlement correction work"

PRODUCT

i-LIFT construction method

PRODUCT

Distributors