ジオテック Official site

Lifeline uninterrupted residential jack-up subsidence correction work

Precise correction of the tilt of a detached house using a 3D laser while keeping the water and gas operational. A jack-up construction plan to maintain the residents' living conditions.

This is a technical specification for solving differential settlement in detached houses without stopping utility services. The work is carried out safely while residents remain in the home, with urban gas, water supply and drainage, electricity, and internet operational. Multiple hydraulic jacks are controlled by a computer, and the building's behavior is monitored in real-time using a 3D laser level measuring device. Millimeter-level lift-ups are performed to avoid imposing excessive deformation stress on the structure. The site is designed to be space-efficient, utilizing a low-noise and low-vibration system with electric hydraulic pumps and soundproof generators to prevent neighborhood disturbances. Additionally, the method of reinforcing cracks in the foundation concrete with carbon fiber sheets, which have ten times the strength of steel plates, is also explained. This engineering document focuses on technical management and safety during construction while residents are living in the home, promising the highest quality.

Related Link - https://www.jiban.co.jp/service/chinka/index.htm

basic information

It describes advanced technical specifications that support safe construction during occupancy. It covers the specifications of high-pressure flexible follow pipes that prevent the rupture of water, sewage, and gas lines, three-dimensional displacement measurement sensors that continuously monitor millimeter-level inclinations, and the system configuration of computer-controlled hydraulic multi-jacks. It includes detailed technical data such as the physical properties of carbon fiber sheets and epoxy resin matrices that achieve shear reinforcement and improved ductility of the foundation, as well as the dimensions of compact insertion equipment that minimize excavation space.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It can be utilized by architectural structural designers, geotechnical engineers, and construction management professionals in situations where they technically design and verify correction work for differential settlement in residential areas and narrow plots. This includes proposals for construction plans for households with elderly or dependent individuals where water and gas cannot be shut off, horizontal corrections while maintaining the functionality of stores and multi-family homes, and the creation of construction safety management manuals in extremely narrow and densely populated areas. It serves as an essential specification definition in practical fields that require advanced technical estimation and reliable safety assurance.

Foundation repair work | A highly advanced construction plan to correct the tilt of the building by millimeters without interrupting any lifelines such as water and gas while you remain in your home | Geotech

TECHNICAL

Method of repair work: "Settlement correction work"

PRODUCT

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

i-LIFT construction method

PRODUCT

Distributors