ジオテック Official site

Settlement correction | Cracks and settlement of the foundation to be investigated with SWS and partial jacking.

Identify the source of subsidence through SWS surveys and restore cracks and subsidence in the mat foundation at low cost using partial jacking. We protect asset value with rational reinforcement.

We propose a high-efficiency repair and reinforcement plan that eliminates excessive costs for localized subsidence and structural cracks in the foundation. Through preliminary SWS (Screw Weight Penetration) tests, we precisely identify the soft layers and specific areas that cause subsidence. By adopting a "partial jack-up method" that targets only the affected areas rather than lifting the entire building, we significantly reduce equipment, personnel, construction time, and costs. Additionally, for foundation cracks, we combine high-viscosity epoxy resin injection, carbon fiber sheet application, and foundation reinforcement with additional concrete to enhance the durability and toughness of the structure beyond that of a new building. After construction, we implement steel pipe pile driving, pressure slab installation, and mortar filling to fundamentally eliminate the risk of subsidence recurrence. This is a rational solution that addresses on-site challenges while simultaneously achieving cost optimization, structural safety, and the maintenance of asset value.

Related Link - https://www.jiban.co.jp/

basic information

The applicable target is single-family wooden houses (with a cloth foundation structure). The investigation specifications include SWS (screw weight penetration) tests and high-precision laser floor and perimeter measurements. Small multi-stage hydraulic jacks (5t to 20t) and portable electric hydraulic pumps will be used for lifting equipment. For structural reinforcement specifications, epoxy resin injection materials, U-cut seal materials, and carbon fiber reinforcement sheets (such as the Ganko Oyaji method) will be adopted. For ground reinforcement specifications, STK small-diameter steel pipes (101.6mm to 139.8mm) and steel pressure-resistant plates (thickness of 12mm or more), as well as non-shrink mortar and air milk filling methods will be applied.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is ideal for renovation work on single-family homes where localized subsidence or cracking of the foundation has occurred, and where there is a desire to repair efficiently and safely while keeping costs down. It is utilized by clients who want to resolve subsidence issues quickly within a limited budget, as well as by contractors and renovation companies for risk management measures, especially in sites where they want to avoid complete demolition or extensive renovations of the entire building. It is widely implemented with the aim of simultaneously reinforcing the ground and the foundation structure, restoring the building's seismic performance, preventing further subsidence, and maintaining and preserving asset value over the long term.

Settlement correction work | Analysis of partial settlement of the fabric foundation and structural cracks through SWS investigation, with efficient jack correction and reinforcement | Geotech

TECHNICAL

i-LIFT construction method

PRODUCT

Method of repair work: "Settlement correction work"

PRODUCT

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

Distributors