Subsurface Correction Work | Liquefaction Prevention and Asset Value Recovery with i-LIFT
Prevent liquefaction risks in existing homes with i-LIFT! Improve asset value and structural safety simultaneously through precise measurements.
At Geotech, we offer an asset value enhancement plan using the preemptive prevention method "i-LIFT Method" to address the risks of settlement in existing homes and liquefaction during earthquakes. This method significantly increases ground strength in three stages: forming a support layer, reinforcing the foundation, and lifting up, by pressurized injection of quick-setting high-density cement grout into weak sandy layers. Real-time monitoring with 3D displacement sensors and high-precision lasers achieves millimeter-level horizontal restoration with zero load on the structure. Our compact construction, which does not require demolition or large-scale temporary structures, allows for work to be done while residents remain in their homes, minimizing the economic and mental burden on homeowners. This reinforcement technology provides reliable evidence trusted in real estate transactions and ensures long-term durability, protecting the future of residential assets.
basic information
Based on the i-LIFT method (patent-pending technology), we perform ground reinforcement and building lift-up by pressurizing and injecting a quick-setting cement-based grout material into the ground. For construction management, we use high-precision laser level measuring instruments and three-dimensional displacement measurement devices to continuously implement real-time millimeter-level displacement and level control. The equipment used is designed to be compact and lightweight, accommodating space-saving construction. The injected material boasts excellent durability and chemical stability, preventing re-sinking due to aging deterioration. We establish a reliable structure that can also accommodate the re-attachment of housing guarantees.
Price range
Delivery Time
Model number/Brand name
Subsidance correction work
Applications/Examples of results
It is ideal for preventing liquefaction settlement during earthquakes in existing detached houses, correcting building tilt due to uneven settlement, and fundamentally repairing structural defects during the sale and inspection of used homes. It is effective in real estate renovation projects that aim to restore and maintain the asset value of homes, as well as in renovation sites where there is a desire to reinforce the foundation without demolition or rebuilding. Additionally, it is suitable for sites that want to perform horizontal correction in a short period while living in the home, while keeping temporary housing costs and moving expenses low, and for applications that aim to prevent future re-settlement and provide long-term ground guarantees.
catalog(4)
Download All Catalogs