ジオテック Official site

Blocking liquefaction risk in existing homes | Settlement correction work for narrow lots

Preventing liquefaction settlement in narrow residential areas with the i-LIFT method and digital measurement. Safe horizontal restoration with low noise and construction while living.

As a liquefaction countermeasure for existing homes in narrow sites or densely populated residential areas where the transportation of large heavy machinery is difficult, Geotech offers a pre-subsidence prevention and correction solution using the "i-LIFT method." This method involves the precise injection of quick-setting cement-based grout into the soft sandy layers directly beneath the building using ultra-compact, easily transportable specialized equipment, gradually achieving the formation of a support layer, foundation reinforcement, and millimeter-level lift-up. By utilizing high-precision digital 3D displacement sensors and laser levels, we visualize and monitor the behavior of the building in real-time during construction, correcting it to a perfect horizontal state without placing excessive stress on adjacent houses or structures. Since large-scale demolition or excavation is unnecessary, the construction can be completed while the homeowner remains in their familiar residence, accommodating "construction while living." Through thorough low-noise, low-vibration, and space-saving construction practices, we enhance the seismic resistance and structural safety of the home permanently while preventing neighborhood disputes.

Related Link - https://www.jiban.co.jp/

basic information

Based on the i-LIFT method (patent-pending technology) that accommodates construction in narrow and densely populated areas, we use compact small electric equipment to pressurize and inject quick-setting cement-based grout material. By employing staged injection (support injection, foundation reinforcement injection, lift-up injection), we enhance the ground bearing capacity and safely lift the building. With a digital 3D inclination measurement device and high-precision laser level, we precisely control the lift displacement in millimeters in real-time. The equipment layout is extremely space-saving, making it applicable even in sites with narrow access routes.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is ideal for preventing liquefaction settlement and horizontal correction work for existing houses in densely populated residential areas where large construction vehicles and excavation machinery cannot enter, and where the distance from neighboring property boundaries is extremely narrow. It demonstrates its effectiveness in renovation sites where there is a desire to dramatically improve the ground bearing capacity under the foundation without demolition or site expansion. Additionally, it is widely used for single-family homes where there is a need to avoid temporary relocation of residents and complete construction in a short period while maintaining living infrastructure, as well as for applications aimed at reliably preventing future differential settlement and re-settlement.

Subsidance correction work | Preventing liquefaction subsidence risks in small or densely populated areas with pressure-injected chemical solutions! Ground reinforcement for existing homes using the i-LIFT method | Geotech

TECHNICAL

i-LIFT construction method

PRODUCT

Method of repair work: "Settlement correction work"

PRODUCT

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

Distributors