ジオテック Official site

i-LIFT method | Blocking liquefaction settlement of existing houses with pressure-injected chemical solution

Immediate response to settlement issues after handover using the i-LIFT method. Restoring the trust of contractors through precise measurements and construction while residents are living on-site.

The "i-LIFT method" from Geotech provides an immediate solution to risks of differential settlement and liquefaction after handover. It involves pressurized injection of quick-setting cement-based grout directly beneath the building to address insufficient reinforcement at the time of construction and localized soft layers. This advanced technology achieves the formation of support layers, foundation reinforcement, and horizontal correction as a unified process. High-precision laser levels and 3D displacement measuring devices visualize elevation data in real-time, achieving millimeter-level accurate horizontal restoration without secondary damage to the structure. Construction can be carried out while residents remain in the building, completely eliminating temporary housing costs and moving expenses associated with relocation. We fulfill our accountability to clients with objective data based on scientific evidence, strongly supporting the recovery of corporate trust and smooth after-sales solutions.

Related Link - https://www.jiban.co.jp/service/chinka/index.htm

basic information

Based on the i-LIFT method (patent pending technology), pressure-injected cement-based grout material is injected into the ground. By using staged injection (support injection, foundation reinforcement injection, lift-up injection), the ground bearing capacity is enhanced, and real-time control is continuously performed using high-precision laser levels and 3D displacement measuring devices. The compact and lightweight equipment configuration allows for rapid construction even in the vicinity of existing houses or in narrow spaces. A construction management system is in place that can record and submit precise measurement data before and after construction as objective evidence.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is ideal for urgent repairs of uneven settlement discovered in newly built or recently constructed homes after handover, additional reinforcement of insufficient foundation depth during construction, and measures to prevent pre-settlement due to liquefaction during earthquakes. It demonstrates its effectiveness in settlement repair work covered by warranty follow-up and defect liability insurance by house manufacturers and construction companies. It can be widely utilized in sites where there is a desire to complete construction in a short period while residents remain in their homes without burdening them with temporary housing or relocation, as well as in situations where there is a need to fulfill accountability to clients using clear numerical data.

Subsurface Correction Work | Preventing Liquefaction Settlement Risks in Existing Homes with Liquid Pressure Injection for Construction Companies! After-Support with i-LIFT Method | Geotech

TECHNICAL

i-LIFT construction method

PRODUCT

Method of repair work: "Settlement correction work"

PRODUCT

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

Distributors