RES-P Method | Ground Reinforcement for Energy Facilities [Geotech]
Acquisition of architectural technical performance certification. Plane reinforcement to stabilize equipment foundations even on weak ground.
For the long-term stable operation of energy facilities, a solid foundation that can withstand vibrations and weight is essential. The RES-P method reduces the risk of accidents caused by settlement and differential settlement, and reliably applies pressure to the foundations of facilities on weak ground. It has obtained building technology performance certification and is optimal for foundation work in power plants, substations, plants, and wind power generation. It enhances bearing capacity through the combined effects of the ground and pipes, achieving settlement prevention and reduced maintenance costs.
basic information
【Features】 - This is a highly reliable construction method that has obtained a building technology performance certification (Performance Evaluation No. 04-02). - It enhances the bearing capacity through the composite action of the ground and the pipe by driving slender steel pipes into weak ground. - It is classified as a surface ground improvement method for flat ground. - Design, construction, and supervision are centralized, ensuring it operates under a reliable quality management system. - The slender steel pipes used are treated for rust prevention, considering long-term durability. 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all ground-related tasks, including ground surveys, ground reinforcement design and construction, and settlement correction work for existing buildings. With extensive experience and solid technology, we provide optimal solutions tailored to our customers' needs, creating the future of cities from the ground up.
Price range
Delivery Time
Model number/Brand name
RES-P method
Applications/Examples of results
It is optimal for reinforcing the foundation ground of small-scale buildings, boasting a rich track record of over 60,000 improvement projects to date. The applicable range is limited to buildings with up to three stories above ground, a height of 13 meters or less, and a total floor area of 1,500 m² or less. The foundation structure can be applied to slab foundations with a long-term design load of 80 kN/m² or less, or to strip foundations with a load of 50 kN/m² or less. As practical examples of achievements, it demonstrates outstanding advantages in sites where no soil is generated due to non-excavation construction, eliminating disposal costs; in sites that can be handed over to the next process immediately with zero curing time; and in tight construction projects in narrow spaces or near retaining walls, leveraging low vibration and low noise specifications.