ジオテック Official site

Settlement correction work | Pinpoint identification of localized subsidence due to buried waste! Pressure-resistant slab work

Solve subsidence of buried waste at low cost! Significantly reduce costs and construction time with pinpoint underground exploration and pressure-resistant slab jacking.

We propose a low-cost settlement correction that achieves significant reductions in costs and construction time. Subsurface debris and buried waste that cannot be captured in ground surveys lead to irregular localized settlement where only part of the building sinks. Since full pile driving and large-scale ground improvement are expensive, it is extremely effective to pinpoint and address the buried areas that are the true cause of the settlement. At Geotech, we locally identify the settlement areas caused by buried waste through hand auger drilling and pinpoint subsurface exploration, thoroughly cutting unnecessary preliminary survey costs and overall construction expenses. For horizontal adjustment, we employ a jack-up method using compact thick steel plates for load-bearing slabs. Even in narrow sites where temporary machinery access is difficult, we achieve precise lifting in millimeter increments using small hydraulic jacks, leveraging the building's weight as a counterforce, dramatically reducing construction time and costs. After lifting, we flow air-entrained mortar (air milk) into the voids under the floor, and for cracks in the foundation, we also use high-viscosity epoxy resin injection. With Geotech's settlement correction construction menu, we provide low-cost and reliable restoration of the foundation.

Related Link - http://www.jiban.co.jp/service/etc/ganko.htm

basic information

This is an investigation into the causes of localized settlement in existing single-family homes (wooden, lightweight steel structure, cloth foundation, and flat foundation) and the horizontal restoration work. Local test excavations will be conducted using underground exploration tools (hand auger and probing rod), and inclination angle measurements will be taken with a high-precision laser level. In the pressure plate jack-up method, carbon steel plates or concrete pressure plates measuring 500 mm or more in size and 12 mm or more in thickness will be placed, and lifting and horizontal fine adjustments will be performed using linked hydraulic jacks. The standard specifications will include high-density filling of air milk (bubble mortar) into lower gaps and pressure injection of high-viscosity epoxy resin into cracks in the concrete foundation.

Price range

Delivery Time

Model number/Brand name

Subsidance correction work

Applications/Examples of results

It is used for the restoration of localized differential settlement of existing houses caused by underground obstacles or debris burial, as well as for correcting the tilt of floors and columns. It is ideal for cases where you want to minimize excessive demolition and reinforcement costs associated with overall construction, while identifying localized causes and performing minimal-scale horizontal lifting. It is suitable for densely populated areas or narrow sites where large construction machinery cannot enter, and for completing restoration work while living in the property without causing moving or temporary housing. It is widely used as a low-cost proposal for foundation stabilization before renovation or repair work, as well as in geotechnical settlement correction work menus.

Settlement correction work | Identifying localized settlement caused by buried debris hidden in gaps of ground investigation points! Pinpoint exploration and pressure plate jack-up correction | Geotech

TECHNICAL

Foundation Reinforcement Construction System "Ganko Oyaji"

TECHNICAL

Method of repair work: "Settlement correction work"

PRODUCT

i-LIFT construction method

PRODUCT

Distributors