Subsurface Correction Work | Level Restoration of Subsurface Debris through Pressure Plate Jacking Up
Identifying subsidence of underground debris! Achieving infrastructure protection and horizontal restoration without halting operations through pressure plate jacking.
Uneven settlement caused by buried debris, which is a blind spot in ground investigation data, is increasingly adding excessive stress to gas and water pipes directly beneath buildings, raising the risk of breakage. Accurate identification of the cause and safe horizontal correction during ongoing operations is urgent. Geotech visualizes underground structures through hand auger drilling and pinpoint subsurface exploration, objectively identifying settlement factors. The method involves space-saving pressure slab jacking. Using the building's weight as a reaction source, small hydraulic jacks perform millimeter-level lifting, while laser measurements continuously monitor pipe displacement. Safe horizontal restoration is possible without interrupting infrastructure. Additionally, pressurized filling of air milk into underground voids and injection of high-viscosity epoxy resin into foundation cracks are used in combination to prevent re-settlement and ensure long-term equipment protection. Geotech's technology maintains peace of mind in daily life.
basic information
This is a pipe protection type subsidence correction technology targeting existing detached houses and mixed-use residential buildings (wooden, lightweight steel, cloth foundation, and flat foundation). For underground obstacle exploration, we employ hand auger drilling machines and probing rods for trial excavation and line identification, measuring inclination angles and height differences in millimeters using high-precision digital laser levels. In subsidence correction, structural carbon steel plates with a thickness of 12 mm or more (at least 500 mm square) or concrete pressure plates are placed, and pipe-following lifting is performed through linked control of small hydraulic jacks. For foundation reinforcement, high-adhesion epoxy resin injection materials are used, and lightweight bubble mortar (air milk) is injected at low pressure and high density into the bottom voids.
Price range
Delivery Time
Model number/Brand name
Subsidance correction work
Applications/Examples of results
It is used for the repair of localized differential settlement in single-family homes and mixed-use residential buildings caused by the sinking of underground buried waste, as well as for preventing distortion and correcting the level of utility piping. It is ideal for sites that want to complete construction while fully maintaining living infrastructure and store operations, while avoiding the risk of broken water leaks in city gas pipes and water supply and drainage pipes. It meets the needs of store owners and clients who absolutely do not want to cause business interruptions due to construction while living on-site or through temporary housing or moving. It is widely utilized as a high-value-added solution in geotechnical settlement correction construction menus, ensuring the safety of lifelines.
catalog(4)
Download All Catalogs