All products and services
31~60 item / All 81 items
-

High corrosion-resistant IBO-Z lock bolt
Improved rust prevention performance! Introducing a lock bolt that is also effective as an injection bolt by utilizing the hollow space.
last updated
-

Simple Repair Method for Guardrail Posts "GPR Method"
No need for maintenance time! We have developed a method to repair supports through partial construction.
last updated
-

High drainage three-layer T-type sheet waterproofing material for FILM construction method.
Even after mortar filling, the drainage layer is secured, maintaining high drainage performance.
last updated
-

Bored piles and embedded piles "micro piles"
Improved adhesion performance with grout material! Pile material combining nodules and economical valves.
last updated
-

ShieM-CS(TN) method [fall prevention measures + deterioration prevention measures construction]
Small pieces can simultaneously prevent concrete deterioration and can be completed in one day.
last updated
-

Tunnel backside drainage material "Tamago Pack Drain"
A product with a shape similar to an egg carton and a large water flow area! Proven results in tunnel groundwater treatment measures, etc.
last updated
-

High Drainage Waterproof Sheet for Tunnels "Hyper Panel Signal Sheet"
For spring water measures! Damage check signal layer & high drainage performance three-dimensional mesh body.
last updated
-

Sheet waterproofing material "Hyper Panel SP/SPG Sheet (IH Type)"
A sheet waterproofing material that can adapt to a variety of applications due to its strong and stable welding fixation strength.
last updated
-

Construction method "Hybrid Fore-Piling"
Enhance blade stability with a combined pattern of "long-length fore piling" and "long-length mirror reinforcement work."
last updated
-

Capra System "FACESS"
Special coupler for Me-fix long-length cut wing reinforcement that realizes "inhibition effect" and "reinforcement effect".
last updated
-

Rock Solidification Injection Material "RBS-USR (Silica Resin)"
Exhibits effectiveness even in a limited range of improvements with early strength development! Flame-retardant rock solidifying material.
last updated
-

Tunnel waterproof sheet "KFC Tight Liner"
Protecting against groundwater pressure. A high-performance waterproof system that supports complete peace of mind.
last updated
-

Waterproof sheet with cushioning material for NATM tunnels 'Hyper Panel SS Sheet'
For waterproofing/leak prevention and crack prevention of NATM tunnels! A wide variety is available.
last updated
-

Chemical adhesive waterproof sheet "Fit Liner Type-S"
Effective for areas with a high risk of water leakage! Chemical adhesive waterproof sheets for tunnels.
last updated
-

Chemical adhesive waterproof sheet "Fit Liner"
Waterproof sheets for tunnels with a water-tight structure! Heat welding is also possible, adapting to various conditions.
last updated
-

Long-length cutting edge reinforcement method for grooved steel pipes 'Me fix type R'
Use of small diameter thin-walled steel pipes is possible! High-adhesion type grooved steel pipe long-length cut wing reinforcement method.
last updated
-

Lock bolt plate "Signal Washer"
Real-time status monitoring is possible! Visualization of ground strength and plates for rock bolts.
last updated
-

IBO lock bolt
The entire length is rolled with R32 rope screws to ensure slime discharge performance and stable adhesion performance!
last updated
-

IBO Dry Mortar
Ideal for post-filling applications of rock bolts! High-performance mortar with early strength and adhesion properties.
last updated
-

SN Dry Mortar
Ideal for initial filling purposes! Mortar for rock bolts with soft and adhesive properties.
last updated
-

CT mortar
Securely anchors rock bolts into the ground! Fast-setting expansion type premixed mortar.
last updated
-

Lock bolt "CT bolt"
Easily inject and fill grouts of various viscosities! Long-term stable support that can be done manually or automated.
last updated
-

Long Steel Pipe Cutting Edge Reinforcement System "Me Method / Me-fix"
Ecology & Ground Restraint Effect! New Long Steel Pipe Cutting Edge Reinforcement System
last updated
-

AGF-Me (Metal eco) construction method
It is possible to separately collect steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as sorted industrial waste.
last updated
-

GFRP lock bolt
Connection using joint couplers is possible! Solid and hollow types are available in the lineup.
last updated
-

Super Spiral Bolt SP24
The head protection materials (cap/mat) for waterproof sheet installation are no longer necessary.
last updated
-

High Durability RPE Rock Bolt
High durability and instant fixation! It can demonstrate displacement suppression effects even against large ground pressure.
last updated
-

Anchor bolt anchoring material "Q Tight"
Introducing the paper tube adhesive anchor method from the NETIS new technology information system!
last updated
-

ALC male thread plug "Double X Anchor"
ALC anchors are now available in new sizes! A plug with eight claws that securely protrude and have the function of anchoring.
last updated
-

Next (inorganic) system capsule anchor "SR Tight"
Achieves strength comparable to conventional resin capsule anchors, excellent workability, and cost-effectiveness.
last updated