Factory and plant equipment manufacturing case study: Gas blower casing
We have handled the manufacturing of the blower! We conducted a trial assembly and carried out a leak test.
We would like to introduce a case study of the "Gas Blower Casing" from the many achievements of Koki Sangyo Co., Ltd. We handled the manufacturing of the blower, conducted a mock assembly, and performed a leak test. At Koki Sangyo, we design various plants, machinery, and equipment. We propose cost reductions through measures such as preventing errors with 3D modeling and automatic drafting of working drawings. [Case Overview] ■ Request: Gas Blower Casing ■ Delivery Destination: Baosteel *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.