鋼機産業 Official site

Factory and plant equipment manufacturing case study: Crushing equipment framework

110-ton crushing equipment framework! The production involved pre-assembly at the factory for all units, and they were shipped in containers.

We would like to introduce examples of design, repair, and manufacturing of factory and plant equipment from the numerous achievements of Steel Machinery Industry Co., Ltd. We delivered the detailed design and manufacturing of the crushing equipment framework. The drawings were converted and designed using Tekla Structures, and manufacturing and construction drawings were created. All units were pre-assembled at the factory and shipped in containers. 【Case Overview】 ■ Request: Crushing Equipment Framework ■ Delivery Destination: JFE Steel Corporation, East Japan Works (Chiba Area) ■ Weight: 110 tons *For more details, please refer to the PDF materials or feel free to contact us.

Related Link - http://www.kohki-sangyo.co.jp/company/jisseki.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Factory and plant equipment manufacturing case study: Crushing equipment framework

TECHNICAL

Distributors