Construction Method: Multi-Mole Method
The multi-mole method is a mechanized technique for horizontal pushing and vertical excavation work during the installation of sewer connection pipes and public manholes.
During the installation of sewer connection pipes and public manholes, it is necessary to dig horizontal and vertical holes. However, due to the complex site conditions, the current situation relies heavily on manual labor, making labor-saving measures at the site a pressing issue. The Multi-Mole method mechanizes horizontal pushing and vertical excavation using "TonTon-kun" and "BuruBuru-kun." In addition to being used independently, it also allows for the joining of horizontal and vertical work. The Multi-Mole method significantly improves not only labor-saving but also safety and construction quality.
basic information
【Features】 ◯ No need for a dedicated launch shaft, small space is sufficient ◯ Free from badger digging, thus safe ◯ Amazing low-cost economic efficiency ◯ Quick construction, and the work is extremely simple ● For more details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
Applications/Examples of results
Crossing of structures (such as drainage ditches) Crossing of roads with heavy traffic Shaft for small manholes Shaft for public utility access