丸八土建 Official site

Maruhachi Doken Co., Ltd. Slope Construction Method

We contribute to natural regeneration and environmental improvement through slope construction work.

The special slope construction method "TG Greening Method" achieves a high level of slope afforestation by recreating the granular structure of natural topsoil and the rooting effect of plant-based continuous fibers. The "SD Method" is a no-scaffolding rock bolt method that can accommodate various sites with special conditions. The "Porous Concrete Spraying Method" forms a permeable porous concrete, allowing drainage at all cross-sections. The "No-Scaffolding Anchor Method" enables high-altitude construction using a wire movement system without scaffolding. 【Product Lineup】 ○ TG Greening Method ○ SD Method ○ Porous Concrete Spraying Method ○ No-Scaffolding Anchor Method For more details, please contact us or download the catalog.

Related Link - http://www.maru8doken.co.jp/pori/index.html

basic information

【Overview】 [TG Greening Method] ○ SF Greening Method: Forms a strong and thick growth foundation ○ TG Greening Method: Incorporates adhesive fibers into the base material for stronger reinforcement ○ ER Greening Method: Cultivates and mixes local topsoil to enhance foundation activity ○ MF Greening Method: Achieves safe spraying construction even on steep slopes with straw mat protection [SD Method] ○ Forest Belt Construction: Can be implemented without cutting down lush trees ○ Narrow Site Construction: Allows for manual transportation and installation using unique wiring ○ Steep Slope Construction: Can be carried out with minimal construction without the need for traffic regulation [Porous Concrete Spraying Method] ○ Vegetated Riprap: Enables the implementation of nature-based river engineering methods according to the materials introduced into the cells ○ Slope Greening: Prevents erosion of slopes and allows for protection and greening of the slopes ○ Slope Protection: Stabilizes the surface by providing sufficient weight to the slope, preventing landslides and falls [No Scaffolding Anchor Method] ○ Wire movable system eliminates the need for scaffolding ○ Drilling diameter Φ90 to Φ115 / drilling length 15m construction performance ○ Compatible with all drilling methods, including hydraulic double-tube drilling ● For more details, please contact us or download the catalog.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please contact us or download the catalog.

Maruhachi Doken Co., Ltd. Special Slope Construction Method

PRODUCT

Distributors

Recommended products