Maruhachi Doken Co., Ltd. Slope Construction Method
We contribute to natural regeneration and environmental improvement through slope construction work.
The special slope construction method "TG Greening Method" achieves a high level of slope afforestation by recreating the granular structure of natural topsoil and the rooting effect of plant-based continuous fibers. The "SD Method" is a no-scaffolding rock bolt method that can accommodate various sites with special conditions. The "Porous Concrete Spraying Method" forms a permeable porous concrete, allowing drainage at all cross-sections. The "No-Scaffolding Anchor Method" enables high-altitude construction using a wire movement system without scaffolding. 【Product Lineup】 ○ TG Greening Method ○ SD Method ○ Porous Concrete Spraying Method ○ No-Scaffolding Anchor Method For more details, please contact us or download the catalog.
basic information
【Overview】 [TG Greening Method] ○ SF Greening Method: Forms a strong and thick growth foundation ○ TG Greening Method: Incorporates adhesive fibers into the base material for stronger reinforcement ○ ER Greening Method: Cultivates and mixes local topsoil to enhance foundation activity ○ MF Greening Method: Achieves safe spraying construction even on steep slopes with straw mat protection [SD Method] ○ Forest Belt Construction: Can be implemented without cutting down lush trees ○ Narrow Site Construction: Allows for manual transportation and installation using unique wiring ○ Steep Slope Construction: Can be carried out with minimal construction without the need for traffic regulation [Porous Concrete Spraying Method] ○ Vegetated Riprap: Enables the implementation of nature-based river engineering methods according to the materials introduced into the cells ○ Slope Greening: Prevents erosion of slopes and allows for protection and greening of the slopes ○ Slope Protection: Stabilizes the surface by providing sufficient weight to the slope, preventing landslides and falls [No Scaffolding Anchor Method] ○ Wire movable system eliminates the need for scaffolding ○ Drilling diameter Φ90 to Φ115 / drilling length 15m construction performance ○ Compatible with all drilling methods, including hydraulic double-tube drilling ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.