丸八土建 Official site

[Information] Examples of Public Works Utilizing Polysoil Greening Method <NETIS Registration>

We will reveal the state of the project several months after construction, starting from before the construction! We will introduce various examples of public works utilization.

This document introduces various public works utilization examples of the Polysoil greening method, which was implemented as a new construction method for vegetation work. *NETIS Registration: KT-210082-A Photos showing the condition from the completion of construction to two months afterward, as well as the construction status, are included. Please use this as a reference for Polysoil greening work. 【Published Examples】 ■ Nezu Mido District Section 2 Land Readjustment Project (Before construction - 2 months after construction) ■ Water Source Preservation Emergency Improvement Project No. 1-2 (Before commencement - 11 months after construction) ■ H29 Natural Disaster Prevention Project No. Matsub-6-2 (Before commencement - 5 months after construction) ■ H30 Preventive Mountain Management Project No. 1 (Before commencement - 5 months after construction) ■ Meiwa Town Road Disaster Recovery Project (Before commencement - 1 year and 3 months after construction) *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.maru8doken.co.jp/pori/index.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Information] Case Studies of Public Works Utilizing Polysoil Greening Technology

TECHNICAL

Early greening measures for landslide disaster sites: "PoliSoil greening work"

PRODUCT

Distributors

Recommended products