丸八土建 Official site

[Data] Polisoil Greening Method Construction Achievement Collection <NETIS Registered>

We will introduce various construction achievements such as "solar power plants" and "disaster recovery projects"!

This document is a collection of construction achievements by Polisoil Green Infrastructure. *NETIS Registration: KT-210082-A It includes cases where soil was washed away and muddy water was generated every time it rained at the "solar power plant," as well as cases of severe gully erosion and sediment runoff. Additionally, we also introduce the construction work for "disaster recovery." 【Published Achievements】 ■ Matsusaka City Solar Power Plant ■ Ise City Solar Power Plant ■ Meiwa Town Solar Power Plant ■ Meiwa Town Road Disaster Recovery Work ■ National Route 422 Disaster Recovery Work No. 1 *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.maru8doken.co.jp/pori/index.html

basic information

[Other Publication Achievements] ■ Slope Failure Countermeasure Work in the Hatai District ■ Natural Disaster Prevention Project No. 7 (Shikamiya) ■ Erosion Control Project No. 1 (Tochidaniro) *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Data] Polisoil Greening Construction Achievement Collection

TECHNICAL

Early greening measures for landslide disaster sites: "PoliSoil greening work"

PRODUCT

Distributors

Recommended products