丸八土建 Official site

[NETIS Registration] Numerous examples of public works utilization! Polysoil greening method

Three effects of shortening construction time, improving landscape, and ensuring safety with one method! We will clearly introduce the situation before and several months after construction with photo documentation.

This document introduces various public works applications of the Polysoil greening method, which was implemented as a new construction method for vegetation engineering. *NETIS Registration: KT-210082-A It includes photos showing the condition from the completion of construction to two months afterward, as well as the construction status. There are numerous achievements as public works, so please feel free to contact us if you have any concerns. 【Examples of Cases Featured】 ■ Nezu Mido District Section 2 Land Readjustment Project (Before construction - 2 months after construction) ■ Emergency Conservation Project for Water Source No. 1-2 (Before commencement - 11 months after construction) ■ H29 Natural Disaster Prevention Project No. Matsui-6-2 (Before commencement - 5 months after construction) ■ H30 Preventive Mountain Management Project No. 1 (Before commencement - 5 months after construction) ■ Meiwa Town Road Disaster Recovery Project (Before commencement - 1 year and 3 months after construction) *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.maru8doken.co.jp/pori/index.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Information] Case Studies of Public Works Utilizing Polysoil Greening Technology

TECHNICAL

Early greening measures for landslide disaster sites: "PoliSoil greening work"

PRODUCT

Distributors

Recommended products