[Data] Riverbank Protection Block Installation Unit Cost
We have published the installation rates for each target product, such as n blocks and cover blocks, in a table!
This catalog introduces the laying rates for "riverbank protection blocks." It references the Ministry of Land, Infrastructure, Transport and Tourism's 2013 fiscal year civil engineering construction estimation standards for concrete block laying (150kg or more per unit) [greening blocks], and summarizes the laying rates for each product in a table. Additionally, important notes are included. For more details, please refer to the catalog. [Contents] <Target Products> ■ n Block, Parallel Block, Re Block, Re Block II ■ Cover Block, Cover Block II, Step Block ■ Step Block, Free Block, Crust Stone, Natural Stone *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Usage】 ■Rivers and Ports *For more details, please refer to the PDF document or feel free to contact us.