MI Official site

[Industry Trends] End of Dedicated Line Service on March 31, 2029, and Countermeasures

A clear explanation of the termination of general-purpose high-speed digital transmission services and the transition methods utilizing existing equipment.

Are you able to confirm the communication environment of the equipment in preparation for the termination of the dedicated line services by NTT East and NTT West? The "General Dedicated Service" and "High-Speed Digital Transmission Service" are scheduled to end on March 31, 2029. In facilities such as water treatment plants, pumping stations, intake facilities, factory utilities, environmental monitoring and weather observation, and power facilities and substations, remote monitoring and control systems using dedicated lines may have been in operation for a long time. On the other hand, for equipment that has been in use for a long time, there may be challenges such as: - Not knowing which equipment is using dedicated lines - Not knowing the manufacturer or model of the telemetry - Unable to determine whether to update the equipment or if only the line can be changed - Concerns about increased costs due to complete updates - The possibility that monitoring and control may become impossible in the future if the current situation remains unchanged Please use this information as a reference for considering future communication updates, especially if you are unsure whether dedicated lines are being used or if you can retain existing equipment.

LegacyX

basic information

【What You Can Learn from This Document】 ■ Main dedicated line services scheduled to end on March 31, 2029 ■ Equipment that may be using dedicated lines ■ Points to confirm before the service ends ■ Considerations when transitioning from dedicated lines to new communication methods ■ Examples of communication updates utilizing existing equipment ■ Communication methods using LTE, LPWA, IP, VPN, etc. ■ Usage scenarios in water treatment, factories, environmental monitoring, power facilities, etc. 【Contents of the Document】 ■ Scheduled end date for dedicated line services March 31, 2029 ■ Main services affected - General dedicated service - High-speed digital transmission service ■ Main considerations for communication updates - Confirmation of currently used lines - Verification of telemetry/communication devices - Checking if existing equipment can be reused - Consideration of alternative communication methods - Overall configuration review of remote monitoring/control systems ■ Examples of communication update methods LTE/5G, LPWA, IP, VPN, analog/digital I/O, etc. ■ Examples of listed equipment Water treatment facilities, pump stations/water intake facilities, factory utilities, environmental monitoring/weather observation, power facilities/substations

Price range

Delivery Time

Model number/Brand name

LegacyX

Applications/Examples of results

If you are unsure about the current line you are using or would like to consider migration methods that utilize existing equipment, please consult MI with the request "I would like to confirm the dedicated line."

AirREAL senyousen teishi

TECHNICAL

Communication Conversion OS 'LegacyX' | Case Studies on Reducing Communication Costs

TECHNICAL

Factory DX: Are you only stopping at visualization? | Improvement DX Practical Guide

TECHNICAL

Distributors

Our company handles devices and equipment centered around IoT/M2M technology. By enabling devices and equipment connected to the network to exchange information with each other through the network, it is possible to directly collect data and control the devices and equipment without human intervention. This significantly contributes to improving operational efficiency, protecting the environment, and reducing labor costs.

Recommended products