エムエルティーソイル Official site

MLT Method Construction History Document (Numerous Examples of Hard Ground)

Introducing a list of construction history using the MLT method! Featuring numerous examples on hard ground!

In the "MLT Method Construction History Document," we present a list of our construction achievements. We have successfully addressed numerous challenging sites that are difficult to work with using conventional methods through the "MLT Method." 【Construction Achievements (Excerpt)】 ■ 2009: Installation of Temporary Bridge for Nōu Ohashi Detour - Client: Ministry of Land, Infrastructure, Transport and Tourism, Hokuriku Regional Development Bureau, Takada River National Route Office - Type of Work: Pier Pile - Geological Layer: Gravel mixed with cobbles - Initial Design: Down-the-Hole Hammer ■ 2009: Sendai City High-Speed Railway East-West Line, Nishi Koen Section - Client: Sendai City Transportation Bureau - Type of Work: Retaining Pile - Geological Layer: Gravel mixed with cobbles, soft rock - Initial Design: Earth Auger ■ 2010: Reinforcement Work for Yamamoto Coast Embankment - Client: Ministry of Land, Infrastructure, Transport and Tourism, Tohoku Regional Development Bureau, Sendai River National Route Office - Type of Work: Steel Sheet Pile Pre-Boring - Geological Layer: Riprap, Concrete Blocks - Contracted Method: MLT Method *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.mltsoil.co.jp/jisseki.html

basic information

【Other Construction Achievements】*Examples of MLT Method Adopted in Design ■ 2011 Improvement Work at Yoneyama Intersection  ・Client: Director of the Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism, Naoetsu Road Office  ・Type of Work: Retaining Piles  ・Geological Layer: Mudstone  ・Contracted Method: MLT Method ■ 2012 Temporary Construction of the Breakwater at Himekawa Port (-10m)  ・Client: Niigata Prefecture Itoigawa Regional Promotion Bureau  ・Type of Work: Steel Sheet Pile Breakwater  ・Geological Layer: Gravel Mixed with Pebbles  ・Contracted Method: MLT Method ■ 2013 Removal of Old Bridge and Box Construction for 3.4.1 Chuo-dori Line Wide Area Cooperation (Street)  ・Client: Niigata Prefecture Tokamachi Regional Promotion Bureau  ・Type of Work: Retaining Piles  ・Geological Layer: Gravel Mixed with Pebbles  ・Contracted Method: MLT Method, etc. *For more details, please refer to the PDF document or feel free to contact us.

Price information

-

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

MLT Method Construction History Document

TECHNICAL

MLT method [new type machine] completed!!

PRODUCT

Hard Ground Pre-Boring "MLT Method (No-Debris Hole Wall Method)"

DOCUMENT

Distributors

Recommended products