Construction achievements
Numerous examples of soil retention methods, such as soil nails and steel sheet piles! Introducing the construction achievements of the MLT method!
We are introducing the construction achievements of MLT Soil Co., Ltd., which specializes in foundation work. Starting with the "Nuo Ohashi Bypass Temporary Bridge Installation Project" conducted in 2009, we have numerous achievements including the "Yamamoto Coast Embankment Reinforcement Project" and the "Uta Overpass Project," which were completed by 2016. Additionally, you can view the number of achievements related to the "MLT Method" up to January 2017. 【Construction Achievements】 ■ 2016: Higashi Tobiyama Nadachi Line Hiratani Widening Bypass Temporary Bridge Installation Project ■ 2016: Uta Overpass Project ■ 2015: Certain Thermal Power Plant Project ■ 2015: National Route 283 Kamaishi Road Project ■ 2014: Shinano Embankment Protection Work No. 1, among others *For more details, please visit our website or feel free to contact us.
basic information
【MLT Method Construction Achievements (As of January 2017)】 ■ Ministry of Land, Infrastructure, Transport and Tourism: 5 designated MLT method projects out of 52 cases ■ Other public institutions: 11 designated MLT method projects out of 108 cases ■ Private sector: 82 cases *For more details, please visit our website or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please visit our website or feel free to contact us.