Construction example of MLT method: "Mountain Retaining Parent Pile Work"
Introduction of a completed site using the MLT method for mountain retaining parent piles!
This is an introduction to a construction example of the "Mountain Retaining Parent Pile Work" using the "MLT Method." The "Mountain Retaining Parent Pile Work" involves driving temporary parent piles into a hard ground, and the construction of the Jugo No. 1 irrigation canal was carried out by the Hokuriku Regional Agricultural Administration Bureau of the Ministry of Agriculture, Forestry and Fisheries. Additionally, it has been adopted for the construction of the Hokuriku Shinkansen by the Railway Construction and Transport Facility Development Support Organization. 【Construction Example 1】 ■ Client: Hokuriku Regional Agricultural Administration Bureau, Kuzuryu River Agricultural Water Resource Office ■ Project Name: Jugo No. 1 Irrigation Canal Construction No. 1 ■ Conditions: A gravel layer with numerous cobbles of 300mm or more scattered throughout A geological condition where the effectiveness of the MLT method is maximized *For more details, please visit our website or feel free to contact us.
basic information
【Construction Example 2】 ■Client: Railway Construction and Transport Facility Maintenance Support Organization ■Project Name: Hokuriku Shinkansen Himekawa B Substructure Construction ■Conditions: Hard pebbles and cobbles are densely scattered, making construction difficult with conventional methods ■Result: Construction was carried out efficiently without any soil removal *For more details, please visit our website or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please visit our website or feel free to contact us.