エムエルティーソイル Official site

Example of MLT construction method: "Landslide Prevention Pile Work"

Introducing a case of landslide prevention pile construction using the MLT method! We will showcase a site where the construction has been completed!

This is an introduction to a construction example of "landslide prevention pile work" using the "MLT method." In recent years, with sudden heavy rains and typhoons causing rainfall far exceeding expectations, measures against landslides and debris flows have become urgent. "Landslide prevention pile work" involves driving steel pipe piles to suppress landslides. A landslide occurred in the Katanoe area of Sado City, spanning 100 meters in width and 200 meters in height, where 71 prevention piles were installed in two tiers. Additionally, this method was adopted in the emergency landslide work related to disasters in the Nogema area by the Nagaoka Regional Promotion Bureau of Niigata Prefecture. It can be utilized in many locations, so please contact us first. 【Construction Example 1】 ■ Client: Niigata Prefecture Sado Regional Promotion Bureau ■ Project Name: Katanoe Landslide Disaster Prevention Work ■ Conditions: Installation of 71 prevention piles in two tiers, shortened construction period *For more details, please visit our website or feel free to contact us.

Related Link - http://www.mlt.ecnet.jp/zisuberi.html

basic information

【Construction Example 2】 ■Client: Niigata Prefecture Nagaoka Regional Promotion Bureau ■Project Name: Emergency Landslide Construction Related to Disasters in the Nogema Area ■Conditions: Advantageous in terms of construction period and cost ■Result: Completed construction one month early *For more details, please visit our website or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please visit our website or feel free to contact us.

Related Videos

Hard Ground Pre-Boring "MLT Method (No-Debris Hole Wall Method)"

DOCUMENT

MLT Method Construction History Document

TECHNICAL

Hard Ground Pre-Boring "Low Head MLT Method"

TECHNICAL

MLT method [new type machine] completed!!

PRODUCT

Distributors

Recommended products