Example of MLT construction method: "Vibration-free and low noise"

Construction adjacent to residential areas! Introducing a site where the MLT method was actually implemented.

This is an introduction to construction examples that achieved "vibration-free and low-noise" work adjacent to residential areas through the "MLT method." In the case of the retaining work associated with the construction of the Hokuriku Shinkansen, this method was adopted due to the construction conditions that required no noise or vibration as it was adjacent to residential buildings. Additionally, in the retaining work related to the construction of the Kyushu Shinkansen, this method was also adopted because it was adjacent to apartments and houses, where noise and vibration could not be generated. 【Construction Example 1】 ■ Client: Railway Construction, Transport Facility Development Support Organization ■ Project Name: Hokuriku Shinkansen Kanayama T and other works ■ Details: Retaining work associated with the construction of the Hokuriku Shinkansen ■ Conditions: Hard pebbles and boulders are densely scattered, making conventional methods difficult; adjacent to residential areas with no noise or vibration allowed. *For more details, please visit our website or feel free to contact us.

Related Link - http://www.mlt.ecnet.jp/

basic information

【Construction Example 2】 ■Client: Railway Construction and Transport Facility Maintenance Support Organization ■Project Name: Kyushu Shinkansen Rendaiji Viaduct Construction ■Details: Driving steel sheet piles and steel pipe sheet piles on top of embankment (with boulders over 1000mm scattered) ■Conditions: Adjacent to apartments and houses, noise and vibration cannot be generated The area on top of the embankment is approximately 4.5m wide, making it impossible to use large machinery *For more details, please visit our website or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please visit our website or feel free to contact us.

Related Videos

Hard Ground Pre-Boring "MLT Method (No-Debris Hole Wall Method)"

DOCUMENT

MLT Method Construction History Document

TECHNICAL

Hard Ground Pre-Boring "Low Head MLT Method"

TECHNICAL

MLT method [new type machine] completed!!

PRODUCT

Distributors

Recommended products