Construction example of MLT method: "Narrow Site"

For narrow spaces such as narrow roads and overhead lines! Introducing actual construction sites.

This is an introduction to construction examples in narrow sites with obstacles such as narrow land and overhead lines using the "MLT method." In the widening project of National Route 402, the work became impossible due to the difficult operation of a small crane in a narrow construction yard, leading to a change to the "MLT method." Despite the highly unstable cliff strata, perfect hole walls were maintained, and the construction was completed smoothly. Additionally, it was adopted for the foundation work of the observation tower at the Chubu Electric Power Northern Substation. 【Construction Example 1】 ■ Client: Niigata Prefecture Maki Civil Engineering Office ■ Project Name: Disaster Prevention Work on National Route 402 ■ Details: Narrow construction yard, unstable cliff strata ■ Result: Perfect hole walls were maintained, and construction was completed smoothly. *For more details, please visit our website or feel free to contact us.

Related Link - http://www.mlt.ecnet.jp/

basic information

【Construction Example 2】 ■Client: Chubu Electric Power Company, Inc. ■Project Name: Foundation Work for the Monitoring Tower at Chubu Electric Power Northern Substation ■Details: There are high-voltage lines overhead, making construction with tall machinery impossible. The construction site is narrow, making it impossible to use large machinery. *For more details, please visit our website or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please visit our website or feel free to contact us.

Related Videos

Hard Ground Pre-Boring "MLT Method (No-Debris Hole Wall Method)"

DOCUMENT

MLT Method Construction History Document

TECHNICAL

Hard Ground Pre-Boring "Low Head MLT Method"

TECHNICAL

MLT method [new type machine] completed!!

PRODUCT

Distributors

Recommended products