Examples of MLT construction methods: "Foundation piles, ground improvement, etc."
Introducing actual construction sites where MLT method foundation piles and ground improvement were implemented.
This is an introduction to construction examples of "MLT method," including "foundation piles and ground improvement." In the construction of PHC piles within the Chubu Electric Power substation, the method was applied because there were high-voltage lines overhead, making it impossible to use tall machinery. Additionally, it was adopted for ground improvement (columnar improvement) in the Hokuriku Shinkansen Mineyama Tunnel (East) construction. The method was applied due to the narrow work yard, which made it impossible to bring in large machinery, and the fact that the anchoring area was mudstone. 【Construction Example 1】 ■ Client: Chubu Electric Power Co., Inc. ■ Project Name: Foundation Construction for the Monitoring Tower at Chubu Electric Power Northern Substation ■ Details: Construction of PHC piles within the substation ■ Conditions: High-voltage lines overhead made it impossible to use tall machinery *For more details, please visit our website or feel free to contact us.
basic information
【Construction Example 2】 ■Client: Railway Construction and Transportation Facility Improvement Support Agency ■Project Name: Hokuriku Shinkansen Mineyama Tunnel (East) Construction ■Details: Ground improvement (columnar improvement) at the tunnel entrance ■Conditions: The work yard is narrow, and large machinery cannot be brought in; the anchoring section consists of mudstone. *For more details, please visit our website or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Uses】 ■Foundation Piles ■Ground Improvement *For more details, please visit our website or feel free to contact us.