[Example of Surface Water Management Work] Katano Tunnel
Introduction of a case where arch roofing was installed at the water leakage area on the wall after the removal of the corroded existing SI board!
We would like to introduce a case of leak prevention work in the Tonen Tunnel located in Tsuruga City, Fukui Prefecture, carried out by "Men-dousui Engineering." Due to corrosion of the existing galvanized steel plates (SI boards), their removal led to water leakage from the walls, which could potentially affect the surrounding healthy SI boards, necessitating new leak prevention measures. An arch roofing was installed to match the thickness of the existing SI boards, and caulking was applied at the joints to ensure water diversion. This also improved the appearance. [Challenges] ■ The existing galvanized steel plates (SI boards) were corroded, leading to water leakage from the walls upon removal. ■ There was a possibility of affecting the surrounding healthy SI boards, requiring new leak prevention measures. *For more details, please download the PDF or feel free to contact us.
basic information
【Results】 ■ Installed arch roofing to match the thickness of the existing SI board, with caulking applied at the joints to ensure water drainage. ■ Appearance has been improved. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.