エヌパット Official site

Off-site construction method for air conditioning equipment "A Frame"

The adoption of the slab attachment enables the offset of the insert and the hanging bolt!

The "A Frame" is an off-site construction method for air conditioning equipment aimed at concealed PAC (package air conditioning) and FCU (fan coil units). Even if insert differences occur, the slide function of the main beam and sub-beam allows for the adjustment of the position of vibration-proof fittings (suspension bolts). Since the position of the suspension bolts can be aligned, the installation of post-construction anchors can be omitted. Additionally, by pre-packaging related materials such as bracing fittings and suspension bolts, the time spent searching for parts can be eliminated, significantly reducing on-site work time. 【Points】 ■ Improved seismic resistance ■ Cost reduction + shortened construction period ■ Cost reduction + increased productivity ■ Quality improvement ■ Enhanced safety + shortened construction period *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.n-pat.co.jp/off-site/

basic information

【Product Configuration】 ■ Main Beam (Seismic F Bracket Integrated) ■ Sub Beam (Vibration-Damping Component Integrated) ■ Seismic L Bracket ■ Equipment Hanging Bolt ■ Seismic F Bracket ■ Chamber Hanging Bracket ■ Vibration-Damping Component *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

N-PAT Corporation Comprehensive Product Catalog

CATALOG

Off-site construction method dedicated cart introduction video collection

PRODUCT

Distributors

Recommended products