施工事例
施工事例
創業以来、私たちは積み重ねてきた経験・技術・実績をもとに、お客様の多種多様な課題に向き合ってきました。 これまでに得た知見や事例を最大限に活かし、製品・サービスの提供だけにとどまらず、 「課題解決のパートナー」として最適なソリューションをご提案いたします。 ※無料で現場調査や工法の選定・提案書の作成などを実施しています。 法面保護の法枠工から植生マット/シートによる緑化施工、河川護岸や公園緑地、落石対策、 生物多様性を考慮した環境配慮型工法まで、幅広い領域に対応可能です。 豊富な実績に裏付けられた対応力と柔軟性を強みに、これからもお客様の期待を超える価値を創出してまいります。
1~30 件を表示 / 全 79 件
-
[Construction Example] Waterway construction for erosion control where the delivery of corrugated materials is difficult.
Lightweight (approximately 9kg) and made of only two materials: sheet and ring anchor! A highly versatile civil engineering sheet that excels in workability and can be used for channel construction and drainage basins, hardening with water.
最終更新日
-
[Construction Example] Around the playground equipment. The grass does not wither even when the children run around.
Construction in March 2018 (Heisei 30). An example of installing grass protection materials simultaneously with grass installation around the playground equipment.
最終更新日
-
[Construction Example] Rockfall protection fence construction with posts installed directly into the ground.
Case study of rockfall prevention and mitigation works in a 250m2 area of rock and gravel soil!
最終更新日
-
[Construction Case] Rockfall Prevention and Measures for Road Slopes
A method of preventing falling rocks within a wire mesh by securing floating stones and rolling stones with wire mesh and wire ropes!
最終更新日
-
[Construction Case] Slope protection work where mowing is not possible and grass growth is undesirable.
Suppressing the movement and loss of soil microparticles on slopes due to rainfall and frost heave! A case where a method without greening was adopted.
最終更新日
-
[Construction Example] Long-term suppression of weathering, erosion, and falling rocks, with weed suppression effects as well.
Integration of waterproof sheets with weather resistance and diamond mesh! Case study of diamond mesh combined with erosion prevention.
最終更新日
-
[Construction Example] Rockfall countermeasure and prevention work in areas with widespread boulders and gravel soil.
Examples of rockfall countermeasures and preventive works in a 200m² area with soil consisting of rock masses and gravel!
最終更新日
-
[Construction Case] Rockfall Countermeasures and Prevention Work for Important Infrastructure (Slope near Railway Crossing)
The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!
最終更新日
-
[Construction Case] (Private) Rockfall prevention measures for slope restoration work at temples and shrines.
The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!
最終更新日
-
[Construction Case] Change from vegetation sheet to improved embankment for bypass of national highway.
A case where the vegetation sheet (environmental product) was changed for improved embankment (approximately pH 9.8)!
最終更新日
-
[Construction Example] Greening of Cement Improved Embankment (Sandy Soil) for Road Maintenance Work
Construction on cement-improved embankment with unknown pH! Quantity is 1,000m2, soil type is sandy soil.
最終更新日
-
[Construction Case] Greening of Cement Improved Embankment for Pond Dam Renovation
Order for the prefectural rural disaster prevention and mitigation project! Quantity is 1,300m2, soil type is clayey soil.
最終更新日
-
【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.
The construction period can be shortened, and even if there are no operating factories or alternative parking spaces available, it is possible to carry out the work with minimal yard space!
最終更新日
-
[Construction Example] On rock slopes with the risk of falling rocks such as floating stones and rolling stones.
A wire rope net is installed tightly against the slope! It suppresses the initial movement of loose stones and floating rocks, preventing them from becoming falling rocks.
最終更新日
-
[Construction Example] Easily created with a backhoe! For labor saving and shortening construction time.
A case that tracked the period from before construction, upon completion, and after 2 months, 3 years and 3 months, 5 years and 5 months, and 7 years and 5 months!
最終更新日
-
[Construction Example] Special vegetation mat for greening alkaline soil in improved embankments.
Making alkaline soil greening possible! Due to a pH of 11.3 after the formation of improved embankment, a case where the vegetation mat (standard product) was changed.
最終更新日
-
[Construction Example] Road maintenance and repair in a national park with greening foundation work and natural intrusion promotion work.
Construction within a national park in Ehime Prefecture! The area is 300m2, and the soil type is gravelly soil.
最終更新日
-
[Construction Example] Adopted for the green parking lot of Gifu Prefectural Office. Over 90% high vegetation coverage!
Green coverage rate over 90%! The protruding parts of the grass protection material are designed to withstand minimal pressure and load.
最終更新日
-
[Construction Example] Andersen Park Dog Run. Measures against stress from feces, urine, and foot pressure.
An example of a construction method that secures a root growth layer and prevents compaction due to foot traffic!
最終更新日
-
[Construction Example] A grassy area in a dog run where the grass tends to wither easily due to feces and urine.
Case from December 2019 (R1)! Implemented using a construction method that secures the root growth layer.
最終更新日
-
[Construction Example] A grassy area accessible to people and vehicles. Temporary parking during events.
A structure that ensures the growth layer of roots, preventing compaction due to foot traffic! An example of being used as a parking lot.
最終更新日
-
[Construction Example] Soil erosion control work in sandy soil (shirasu). Greening of the waterway section as well!
The Waterway Department uses Ryokkasuiri! Here are examples of its application for soil conservation in sandy soils.
最終更新日
-
[Construction Case] Minimizing the felling of standing trees on slopes for rockfall prevention in parks.
It is possible to minimize the felling of standing trees on slopes! A case using colored materials.
最終更新日
-
[Construction Example] Greening work with mortar bags for disaster prevention on the slope (embankment) behind the building.
Mixed jade and stone soil, construction for 500m2! A case study followed up 6 months after construction.
最終更新日
-
[Construction Case] Disaster-resistant road construction project. Change from frame work (small area).
Order for disaster-resistant road construction project! Example of change from legal framework work.
最終更新日
-
[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.
Standard equipped with automatic irrigation system! A case study of thin-layer parking greening method installed on pavement.
最終更新日
-
[Construction Example] Rockfall Protection Net (Cover Type) for Road Slope Repair and Maintenance Work
Application for rockfall countermeasures and prevention, case from October 2022 (R4), quantity 3,500 m².
最終更新日
-
[Construction Case] Close-contact rockfall prevention (rope laying work) for slope and flooding countermeasures.
Case from June 2021 (R3)! Implemented using a method that combines rope laying work with a thick wire mesh.
最終更新日
-
[Construction Case] Adopted as an alternative method for simple spray formwork at the end of the construction period.
The deadline is approaching, and this is a case where an alternative method was adopted for the simple spray application frame construction!
最終更新日
-
[Construction Case] Contributing to landscape preservation with large soil bags that can be greened.
The use of large sandbags combined with landscape greening contributes to landscape preservation.
最終更新日