[Construction Example] Adopted for seismic reinforcement of elevated bridges on the Honshu-Shikoku Bridge Expressway.
Excellent erosion resistance and mud suppression, capable of preventing erosion! Introducing case studies of construction on high-standard roads.
This is an introduction to a case where the erosion prevention sheet "Drain Sheet 45-K" was installed during the seismic reinforcement work on an elevated bridge in Hyogo Prefecture. (Private Sector) We received an order from the Honshu-Shikoku Bridge Expressway and completed a quantity of 3,600 m². This product improves adhesion to the ground through a wire mesh, making it more effective in cases where there are gravel or loose stones. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Installation Location: Hyogo Prefecture ■ Installation Date: April 2022 (Year 4 of Reiwa) ■ Quantity: 3,600 m² ■ Soil Type: Gravelly Soil ■ Application: High-standard Road *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.