[Construction Example] With Nichiue's vegetation mats, you can also distribute the construction period.
Achieving uniform vegetation through soil adhesion effects! Introducing a case where 4,500m2 of clayey soil was constructed.
We would like to introduce a case where the vegetation mat "Harishiba Kangaroo N" was installed during the improvement work on National Route 394 in Aomori Prefecture. To avoid summer construction, the upper section was completed in July and the lower section in September. This product features fertilizer bags attached to a net at 40 cm intervals, which are installed along contour lines to disperse runoff water from rainfall and mitigate soil erosion. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Construction Location: Aomori Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Quantity: 4,500 m² ■ Soil Type: Clayey Soil ■ Purpose: Road *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.