[Construction Example] Road maintenance and repair in a national park with greening foundation work and natural intrusion promotion work.
Construction within a national park in Ehime Prefecture! The area is 300m2, and the soil type is gravelly soil.
We would like to introduce a case where the vegetation mat "Kyojingar ST60" with a green infrastructure foundation (mortar bags) was installed as part of road maintenance and repair work. This project was commissioned by the Ministry of the Environment, Chugoku-Shikoku Regional Environment Office, and was carried out within a national park in Ehime Prefecture. The area covered was 300m², and the soil type was gravelly soil. The solidified mortar bags maintain a growth foundation over the long term. Additionally, a special thin cotton layer protects the surface until the plants become established. [Case Overview] ■ Project Name: Road Maintenance and Repair Work ■ Location: Ehime Prefecture ■ Date of Construction: October 2021 (R3) ■ Area: 300m² ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.