[Construction Example] Easily created with a backhoe! For labor saving and shortening construction time.
A case that tracked the period from before construction, upon completion, and after 2 months, 3 years and 3 months, 5 years and 5 months, and 7 years and 5 months!
We would like to introduce a case where our large vegetation soil bag "Mega Medel" was used in road maintenance and repair work. This project was commissioned by the Ritto City Hall in Shiga Prefecture and was carried out on a forest road within Shiga Prefecture. The quantity was 25 bags, and the soil type was gravelly soil. Our product can be easily produced with a backhoe. Compared to conventional vegetation soil bags, it offers labor savings and a reduction in construction time. 【Case Overview】 ■ Project Name: Road Maintenance and Repair Work ■ Location: Shiga Prefecture ■ Construction Date: March 2015 (H27) ■ Quantity: 25 bags ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.