日本植生 Official site

[Construction Example] Greening work with mortar bags for disaster prevention on the slope (embankment) behind the building.

Mixed jade and stone soil, construction for 500m2! A case study followed up 6 months after construction.

We would like to introduce a case where our greening foundation work (mortar bags) with the vegetation substrate mat "Kyojingar" was implemented in the disaster prevention construction behind the government building. This project was commissioned by the Iinan Town Hall in Shimane Prefecture and carried out within Shimane Prefecture. The soil type consisted of rock and gravel, covering an area of 500m2. Before solidification, the mortar bags are flexible, allowing them to adhere closely to the uneven surfaces of the slopes. They solidify naturally with rain (no watering required), creating small steps on the slope to form a stable growth foundation. 【Case Overview】 ■ Project Name: Disaster Prevention Construction Behind the Government Building ■ Location: Shimane Prefecture ■ Construction Date: December 2021 (Year 3 of Reiwa) ■ Quantity: 500m2 ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Green Infrastructure Foundation Work (with Mortar Bag) Vegetation Substrate Mat "Kyojingar"

PRODUCT

Distributors

Recommended products