[Construction Case] Measures and Preventive Works for Rockfall on Forest Roads
Examples of rockfall countermeasures and preventive works in a 1,300m2 area of clay, rock masses, and cobblestone soil!
We would like to introduce a case where our "rockfall protection net (cover type/pocket type)" was installed during the Ohira Forest Road improvement project. This was commissioned by the Western Tottori General Office and carried out within Tottori Prefecture. It involved rockfall countermeasures and preventive work over an area of 1,300 m² with soil types including clayey soil, boulders, and gravel. The method involves securing floating stones and rolling stones with wire mesh and wire ropes to prevent rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Ohira Forest Road Improvement Project ■ Location: Tottori Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Area: 1,300 m² ■ Soil Type: Clayey soil, boulders, gravel *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.