日本植生 Official site

[Construction Case] Rockfall Countermeasures and Prevention Work for Important Infrastructure (Slope near Railway Crossing)

The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!

We would like to introduce a case where our "Tezak Super Lock (contact type)" was implemented in slope maintenance work near a railroad crossing. This project was commissioned by a private entity and carried out in Hyogo Prefecture. The soil type was gravelly soil, and it involved rockfall countermeasures and preventive work over an area of 1,500 m2. The contact type method involves installing thick wire mesh as auxiliary material to prevent erosion from gravel and other materials while preventing floating and rolling rockfalls. [Case Overview] ■ Project Name: Slope Maintenance Work Near Railroad Crossing ■ Location: Hyogo Prefecture ■ Construction Date: February 2021 (Reiwa 3) ■ Area: 1,500 m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

Related Link - https://nihon-shokusei.co.jp/actual-examples/actua…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Source control measures / rockfall prevention / rope laying work 'Tezak Super Lock'

PRODUCT

Distributors

Recommended products